Forecast of United Kingdom Youth Unemployment Rate Using ARIMA Model
Abstract
The economic structural transformation driven by the development of science and technology has led to a reduction in traditional job positions, while emerging industries' skill demands mismatch youths' capabilities. Lagging educational systems struggle to promptly cultivate digitally skilled talents aligned with industrial shifts. This results in a significantly higher unemployment rate among youths (aged 16-24) than the societal average, a global challenge particularly acute in developing economies. Youth unemployment threatens social stability and economic vitality, and predicting its trends could guide policy adjustments and educational reforms to prevent the misallocation of resource and avoid long-term unemployment risks. This study forecasts the United Kingdom youth unemployment rate (ages 16–24) using an ARIMA(1,1,2) model optimized with historical data ranging from November 2004 to November 2024. Results show significant accuracy improvements (R²=0.8905), predicting a decline from 5.2% in 2025 to 4.6% in 2029 under stable economic conditions. Although residual diagnostics confirm model validity, limitations still exist, including linearity assumptions and exclusion of external variables. Future research should integrate hybrid methods and consider diverse scenarios to address nonlinear shocks and structural economic shifts, supporting sustainable employment strategies for government.
References
- Box, G. E., Jenkins, G. M., Reinsel, G. C., & Ljung, G. M. (2015). Time series analysis: forecasting and control. John Wiley & Sons.
- Franses, P. H., & Van Dijk, D. (2000). Non-linear time series models in empirical finance. Cambridge university press.
- Bell, D. N., & Blanchflower, D. G. (2011). Young people and the Great Recession. Oxford Review of Economic Policy, 27(2), 241-267.
- Hyndman, R. J., & Athanasopoulos, G. (2018). Forecasting: principles and practice. OTexts.
- Hyndman, R. J., & Khandakar, Y. (2008). Automatic time series forecasting: the forecast package for R. Journal of statistical software, 27, 1-22.
- Dickey, D. A., & Fuller, W. A. (1979). Distribution of the estimators for autoregressive time series with a unit root. Journal of the American statistical association, 74(366a), 427-431.
- He, J., Li, S. P., He, Y. Y., et al. (2024). Stock analysis based on ARIMA and LSTM models. Modern Information Technology, 8(21), 41–45
- Li, F. R., Yang, F. S., & Chang, Q. Q. (2024). A study on the trend of magnesium prices in China based on the ARIMA model. Modern Marketing (Semi-monthly Edition), 2024(9), 83–85.