Research Article

Modeling Coverage Width of Multibeam Bathymetry and Optimizing Survey-Line Layouts for Simple Terrain

Yizhou She*
Shanghai University

* Corresponding author: [email protected]

Abstract

To address the engineering problem in multibeam bathymetry that coverage width varies with terrain and fixed line spacing may cause missed sounding in shallow areas, this paper develops a three-level progressive survey-line design model consisting of single-line swath/overlap modeling, arbitrary-heading coverage correction, and global recursive line-layout optimization within a unified geometric framework. Unlike regional subdivision or dynamic-programming methods that depend mainly on cell partition or discrete state search, the proposed model gives an explicit geometric chain from depth and slope to line spacing. Sensitivity tests for slope, opening angle, and overlap threshold, together with a measured-terrain checking procedure, are added to clarify robustness and engineering applicability. A numerical example shows that, when the sea area is 4 nautical miles long from east to west and 2 nautical miles wide from north to south, with a central depth of 110 m, a slope of 1.5°, and a transducer opening angle of 120°, the optimal lines should be arranged parallel to isobaths. The solution requires 34 survey lines and a total length of about 125.94 km. The results provide a concise and implementable basis for efficient bathymetric operation over regular sloping seabeds.

Keywords: multibeam bathymetry; coverage width; overlap rate; survey-line layout; simple terrain
Published: July 28, 2026
DOI: 10.54254/2753-8818/2026.35667
Volume: TNS Vol.183
pp. 175-184
Download PDF

References

  1. Wang, X., Hu, S., & Lu, Y. (2024). Brief analysis of the application of the NORBIT iWBMS integrated multibeam bathymetric system in rapid channel survey. China Water Transport, 3, 42–45. (in Chinese)
  2. Chen, X. (2024). Application of a multibeam bathymetric system combined with three-dimensional imaging sonar in bridge-pier scour and siltation detection. Value Engineering, 43(5), 124–126. (in Chinese)
  3. Li, M., & Liang, D. (2023). Application of multibeam bathymetric systems in water conservancy engineering. Guangxi Water Resources & Hydropower Engineering, 6, 9–14. (in Chinese)
  4. Liu, D. (2024). Application of unmanned-vessel multibeam bathymetric technology in evaluation of riprap bank-protection engineering. Guangdong Water Resources and Hydropower, 1, 93–96, 105. (in Chinese)
  5. Sha, H., Fei, X., Ye, F., et al. (2022). Application of an acoustic-inertial integrated single-beam bathymetric system in Yangtze River channel surveys. Bulletin of Surveying and Mapping, 9, 162–166. (in Chinese)
  6. Wang, N., Huang, J., & Rao, T. (2023). Optimization model of survey lines under a multibeam bathymetric system. Electroacoustic Technology, 47(6), 61–64. (in Chinese)
  7. Xia, H., Qiu, S., Shan, X., et al. (2024). Simulation optimization of multibeam survey lines. Technology Wind, 5, 61–63. (in Chinese)
  8. Wang, Z. (2024). Research on the problem of multi-beam line measurement based on the cattle plowing traversal algorithm. Highlights in Science, Engineering and Technology, 82, 10–18.
  9. Guo, Q., Fu, C., Chen, Y., et al. (2023). Application of multi-beam bathymetry system in shallow water area. Journal of Physics: Conference Series, 2428(1), Article 012042.
  10. Suo, J., Zhu, H., & Sun, W. (2023). Study on multi-beam line measurement problem based on geometric mathematical model. Academic Journal of Science and Technology, 8(1), 18–24.
  11. Zhan, H., & Ma, Y. (2023). Research on multi-beam survey line based on multi-dimensional structure analysis. Highlights in Science, Engineering and Technology, 75, 344–352.
  12. Liu, J., He, H., & Li, M. (2024). Research on the optimization of multibeam bathymetric survey line arrangement based on multimodal and clustering techniques. Highlights in Science, Engineering and Technology, 88, 16–28.
  13. Gao, Z., Hou, Y., Huang, W., et al. (2024). Survey-line design based on the main-objective method. Mathematical Modeling and Its Applications, 13(1), 96–101. (in Chinese)
  14. Sun, D., Deng, Y., & Zhu, S. (2023). Multibeam bathymetric model based on gridding and traversal search algorithms. Journal of Nantong Vocational University, 37(4), 70–76. (in Chinese)
  15. Wang, N., Yu, Z., & Wang, J. (2023). Multibeam survey-line layout model based on dynamic programming. Journal of Nantong Vocational University, 37(4), 64–69, 97. (in Chinese)